With the aim of increasing production, a new, 10,000 m2 assembly plant was built in Toledo featuring state-of-the-art technology, which enabled us to multiply our manufacturing and storage capacity and produce more than 500 pieces of furniture a day.
2016: New assembly plant
25 September 2016
-